Project Details
Construction of multiple buildings, including Administration Buildings, Water Treatment Buildings, Effluent Aeration Building, sludge thickener, plant waste basin, and effluent pump station. Generator/Switchgear Building and surge tank area; propane storage tanks facility; rapid mix area; flocculation basin area; membrane basins and associated accessories; chemical storage and feed facilities; manganese removal contactors and accessories; disinfection contact pipeline; finished water storage tank; contactor backwash and finished water pump station; miscellaneous site grading, pile foundation, site piping and site electrical work.