Phase 1: Sludge conditioning improvements, including the installation of belt filter presses, gravity belt thickeners, lime stabilization equipment, and building and electrical upgrades.
Phase 2: Electrical upgrades with two switchboards, generator installations (1.5 MW and 2.0 MW), waste soil removal, and sitework.
Phase 3: Construction of an intermediate pump station, tertiary effluent filter facility, large-diameter wastewater piping (30–60 inches), and electrical and instrumentation improvements.
Phase 4: Replacement of primary clarifier equipment, grit cover support beam upgrades, and additional structural work.
Phase 5: Expansion and improvements to the BNR tanks, blower facility, chlorination system, site piping (36–60 inches), along with electrical and instrumentation upgrades.