Introducing Drone Photogrammetry to the Boat Harbor Treatment Plant Pump Station Conversion Site

Under BIM Manager Zach Emerson’s guidance, MEB is exploring drone photogrammetry’s use on the HRSD Boat Harbor Treatment Plant Pump Station Conversion jobsite.

Photogrammetry is a method of “reality capture” in which three-dimensional data is generated from a series of 2D images. Using a drone for this process enables quick, ongoing captures of the overall site throughout the project. These 3D scans allow for direct coordination and comparison between the real-world jobsite and the 3D BIM model while also regularly documenting progress on site.

how it works //

The drone is pre-programmed to fly in a grid pattern over the site. A series of Ground Control Points (GCPs) are laid out on-site using crosshairs that are easily visible in the drone images. The exact coordinates of these GCPs are captured via survey equipment for later use. The drone takes photos approximately every 3-5 seconds, and in this case, it captured over 240 photos of the 9-acre site. Once the automated flight is finished, the photos get uploaded to a specialized software for processing and alignment to the GCP coordinates, resulting in a geolocated digital copy of the capture area. The results are a 3D “point cloud,” which can be easily viewed and shared online as a snapshot of the project. The scan data can also be exported in a variety of formats, including a 2D “orthomosaic,” which is similar to a satellite view except with a much higher resolution (<1”/pixel).

These processed photogrammetric scans can also be integrated directly into our geolocated BIM model. This ties the digital representation of the project to the physical project site to ensure that both “worlds” align, enabling us to verify that the BIM model is coordinated with ongoing work and vice versa. This not only provides an additional means of quality control on site but also helps ensure that active BIM coordination accounts for as-built conditions throughout the project.

1/4 – Boat Harbor Treatment Plant Pump Station Conversion Site Scan

2/4 – Site Scan with Sheeting Overlaid

3/4 – Site Scan with Federated Model Overlaid

4/4 – Section View of Scan and Federated Model

benefits of photogrammetry //
Aside from BIM coordination and verification of as-built conditions, drone photogrammetry can provide many other benefits on an active jobsite. Ongoing benefits include:

  • Regular documentation of work in place to share with owners and other stakeholders who can’t visit the site regularly
  • Detailed coordination of site logistics
  • Annotations and counts for quantity takeoff
  • Cross-section views to look at topography and elevation information
  • A visual timeline of the project
  • Cut/fill calculations for earthwork
    • it can be calculated against previous scans, design surfaces, and more
  • Stockpile quantification and verification
    • Monitoring on-site material availability
    • Comparing quantities from scans against hauling tickets
    • It is especially powerful when used in conjunction with earthwork calculations

conclusion //
Drone photogrammetry is a very powerful tool that can be used for a wide variety of purposes both on the jobsite and for BIM coordination. It is also beneficial for documentation and progress sharing amongst the project team and other stakeholders. This is only one of the many examples of how reality capture can be incorporated into BIM to better connect the digital project to the physical world while also strengthening communication between the office and the field.