• Subcontractors
  • Employee Portal

Project

HRSD Nansemond Treatment Plant SWIFT Facility & On-site Recharge Wells

As part of the SWIFT program, this fixed price design-build project will be HRSD’s largest SWIFT water-producing facility.

Project Details

The project includes 32 MGD pumping facilities, multiple equalization tanks, electrical buildings, rapid mix, flocculation, sedimentation, and ozone treatment. Three new injection well houses are included as part of MEB’s scope, as well as redirecting the feed and backwash from one existing well. All the above includes deep foundations, shored excavations and dewatering systems, cast-in-place concrete, miles of underground process pipe ranging in sizes up to 54”, and process equipment and piping installation all performed by MEB’s local tradesmen.